At a glance
We welcome FINK enquiries from buyers worldwide. Tell us where the chamber will go and how you plan to use it. Ask the supplier to confirm the full delivered cost, what your property needs and who will support you locally.
Where we supply
We take chamber enquiries from every country. FINK ships worldwide. For each project we confirm the import route, the registration your country requires and the oxygen supply before we quote.
European enquiries are handled project by project. We confirm the route for your country before quoting.
FINK lists Mayo Clinic, Cleveland Clinic and the US Air Force among its installations. FINK reference projects.
Ask for the price of the whole project
Check what is included beyond the chamber: packing, shipping, insurance, unloading, installation and training. Ask whether the team will test the system and show you how to use it before handing it over.
Find out who handles customs paperwork, import charges and taxes. Check the payment currency, when each payment is due and how long the quote remains valid.
Compare offers with the same inclusions. The chamber buying guide explains the other costs to allow for.
Check what is allowed where you live
Ask for the documents that apply to the exact model and how you intend to use it. FINK’s certification information is a starting point, but your supplier and local advisers need to confirm what applies to your project.
Check the rules for the equipment, building work, fire safety and daily operation. Agree who will obtain any approvals. Permission to use a chamber in one country does not automatically cover another.
A separate medical assessment determines whether treatment is right for a particular person. Buying the equipment does not replace that assessment.
For FESL installations, we recommend high-purity medical oxygen in cylinders. Check that a local supplier can provide the required grade, regular deliveries and a reserve supply. A standard concentrator is not a substitute for the prescribed near-100% oxygen supply. See our medical oxygen guide.
Write down who is doing what
Use a simple checklist with a named person or company for each job. It helps prevent gaps between the supplier, shipping company and building team.
| Job | What to confirm |
|---|---|
| Prepare the room | Who checks access, floor strength, space, power and ventilation? |
| Ship the chamber | Who arranges transport, insurance, customs and import paperwork? |
| Install it | Who unloads it, moves it into place and connects the equipment? |
| Get it ready to use | Who tests the system, provides the instructions and trains the operators? |
| Look after it | Who services it, supplies parts and handles urgent problems? |
Check who can help after delivery
Ask whether a technician is available in your area and what help can be given remotely. Find out the support hours, expected response times and any travel charges for a visit.
Read what the warranty covers and excludes. Ask how long replacement parts usually take to arrive and what planned servicing costs.
Confirm the training and maintenance requirements for your exact model. These may differ between chambers from the same manufacturer.
What to tell us
Send your city and country, intended setting, number of seats and preferred timing. Tell us whether you have a room in mind, building plans or a local project team.
You can ask for a first conversation while you are still exploring. You do not have to visit Dubai or arrange clinic treatment to discuss buying a chamber.
Specifications and availability are confirmed per project in FINK’s written proposal.
Common questions
Do I have to be in Dubai to enquire about a FINK chamber?
No. We welcome enquiries worldwide. Tell us where the chamber will be installed so delivery, local requirements and support can be checked.
Does the price include shipping and installation?
Only if the quote says so. Ask for a breakdown covering shipping, insurance, import costs, room changes, installation, testing and training. Check what you must arrange separately.
When can I get a confirmed delivery date?
Ask for a schedule showing what must happen first, including model selection, paperwork and room preparation. The supplier should explain which dates are confirmed and which depend on those steps.
Sources & further reading
- FINK Engineering: manufacturer and international project overview
- FINK Engineering: manufacturer certification information
- FINK reference projects
This guide gives general information. Ask a qualified doctor whether treatment is right for you, what the risks are and what other options you have.